ADF 100 has 4" Screw BSPT or Flange joint PN 16 & ANSI 150. Oval Gear Flowmeter is ideal for High Viscosity fluid. Durable and highly accurate meter.
Series F012-P is basic model to display Rate of Flow and Totalizer.
High Performance display for Rate of Flow and Totalizer Flowmeter.
Series F030 Controller is meant for Batching to switch on or off either Pump, Valve, Light Indicator or Alarm.
High Performance Batch Controller with many Features. Two stage controls. Modbus friendly.
Series AMR100 is Economic version of ADF Display yet rugged with Intrinsicaly Safe feature.
Ultraflux offers high accuracy and repeatability Ultrasonic Flowmeter due to its strong signal and noise elimination technology. Used widely for flow monitoring of the Pump, Leak detection etc. Application are for Clean, Sewerage and Waste Water. HVAC, Chemicals, Pharmaceutica / Ultrapure Water.
Azud from Spain is leader in making Disc type Automatic / Self Cleaning Filter. Filtration are based on Surface & Dept providing wide Filtration area. Backwash is efficient and effective, Use widely in Raw Water, Recycle Water, HVAC, Nozzle application in various industries.
Azud series FT4DCL DLP is Online Filtration whereby Back Wash is done in sequence. Low head loss and minimum back wash water. Surface & Dept Filtration is Water & Energy saving.
Luxon is meant for Heavy Duty application with Carbon Steel body and withstand higher pressure.
The core of Azud Disc Filtration is Surface & Dept Filtration. Used for medium pressure and temperature as the material is Plastic base.
WEY VN series is most popular model used with quality performance and cost effective.
WEY VS series is design to comply ANSI standard. Semi-Lug, light weight and economical. Stainless Body & Seat meet many application in Waste Water, Mining, Pulp & Paper, Sugar, etc
WEY VL series is truly ANSI Valve comply with Full Lug design for Dead End service whereby pipe can be dismantling on one side.
WEY VM series is Ductile Iron construction for General Purpose use.
Jl. Pinangsia Timur No.44 Jakarta 11110, Indonesia
Mon to Fri, 8 am to 4.30 pm Sat - Sun (Close)
sales@gamako.co.id +62 21 6902756, +6281210113067,